July 10, 2024

Columbia Road and Davis Road/Myrtle Ave. intersection will be closed for the construction of a roundabout beginning Monday, July 22, 2024, for sixteen (16) weeks, weather permitting. Columbia Road closure location is between addresses 9311 and 9228. All addresses along Davis Road will only have access from the east. During Phase I of the road closure, Myrtle Ave. will have access from the north until traffic is switched, then during Phase II – access will be from the south.

The detour for Columbia Road closure will utilize Fields-Ertel Road and US22/SR3. The detour for Davis Road closure will utilize Rich Road, Fields-Ertel Road, and US22/SR3. Myrtle Ave. will have access from Columbia Road.

Please note, that Columbia Rd will be open beginning at 4:30 pm on Friday, July 26 – 6:00am on Monday, July 29 in order to accommodate our Festival. A big thank you goes out to Warren County for negotiating with us and their contractor to allow for this opening.

Map

More News...

Live Music Lineup at SMOYFest

Can You Feel the Beat?

You won’t want to miss our music lineup! Live music brings our community together. Come and be part of it! Dance, sing along, and...Read more

Welcome Back Sunday!

Join Us August 17!

As summer winds down and school routines start up again, it’s the perfect time for our parish community to reconnect. Whether you stayed local...Read more

Subscribe to Blog
  •  
  • 1 of 54